Ahmedabad Mumbai ​​Bullet Train Drone View

Ahmedabad Mumbai ​​Bullet Train Drone View Ahmedabad-Mumbai High Speed Rail Corridor (MAHSR corridor) is an under-construction high-speed rail line connecting India’s economic hub Mumbai with the city of Ahmedabad. When completed, it will be India’s first high-speed rail line

Work is in progress on the Ahmedabad-Mumbai fast bullet train project. By 2026, the bullet train among Surat and Bilimora will run at a speed of 350 kmph. Ongoing robot perspectives on procedure on the course are introduced. This robot video of live activity of the whole course will cover you a distance of 352 km in only 2 minutes.

Ahmedabad Mumbai ​​Bullet Train Drone View

See every Pillar of Bullet Route in the video

In a remarkable robot perspective on the continuous bullet train activity, Divyabhaskar shows his perusers a solitary support point from Valsad to Sabarmati. Aside from this, projecting yards of Navsari, Surat, Bharuch, Vadodara are additionally shown. From this video you can find out about how you will feel in the wake of boarding the high velocity bullet train.

Seeing Surat-Ahmedabad station will tear your eyes

The bullet train will have 12 stations among Ahmedabad and Mumbai, however the Sabarmati and Surat stations have been to a great extent finished. Simply seeing the robot perspectives on these two stations will fill your eyes and you will acknowledge how tremendous this station will take care of being assembled. the vast majority of the land for the 502 km bullet train project in Gujarat has been gained and the work is going full speed ahead.

Gujarat will have 8 bullet train stations

The bullet train will run on a 352-km course in Gujarat, covering Vapi, Bilimora, Bharuch, Surat, Vadodara, Anand-Nadiad, Ahmedabad and Sabarmati M8 stations. Terminals for bullet train mentors will be set up at Sabarmati and Surat in Gujarat. As indicated by NHSRCL, the country’s most memorable bullet train station will be prepared in Surat and will be introduced by 2023. There is an arrangement to run bullet train among Surat and Bilimora stations from 2027.

Ahmedabad Mumbai ​​Bullet Train Cost

The project is estimated to cost ₹1.1 lakh crore (US$14 billion), JICA agreed to fund 81% of the total project cost ₹88,087 crore (US$12 billion), through a 50-year loan at an interest rate of 0.1% with a moratorium on repayments up to 15 years and the remaining cost will be borne by the state governments of Maharashtra and Gujarat. 20% of the components used on the corridor will be supplied by Japan, and manufactured in India. (Source – wikipedia)

Important Link

Bullet Trian 3D Project VideoView
Watch Drone VideoView

Thanks for visiting this useful post, Stay connected with us for more Posts. Visit every day for the latest offers of various brands and other technology updates.

Leave a Comment

વોટ્સએપ ગ્રુપમાં જોડાવા અહીં ક્લિક કરો